MSU, Mankato Ostrander Auditorium, Mankato, MN
MSU Mankato and the Centennial Student Union commissioned R. L. Engebretson to renovate and update Ostrander Auditorium at the Centennial Student Union on the Campus. Renovations include replacement of all 349 seats, stage reconstruction with new cherry wood flooring, ceiling replacement with curved acoustical clouds, new front wall finishes with maple and cherry panels, house lighting, theater lighting, and HVAC. The side addition including an accessible ramp, green room and storage areas.
MSU Mankato and the Centennial Student Union commissioned R. L. Engebretson to renovate and update Ostrander Auditorium at the Centennial Student Union on the Campus. Renovations include replacement of all 349 seats, stage reconstruction with new cherry wood flooring, ceiling replacement with curved acoustical clouds, new front wall finishes with maple and cherry panels, house lighting, theater lighting, and HVAC. The side addition including an accessible ramp, green room and storage areas.
Bismarck Civic Center, Bismarck, ND
Bismarck Civic Center is a 300,000 square foot multi-use events center with a 10,000 seat arena, 50,000 square foot exhibit hall, and meeting rooms to serve conventions, sporting events, concerts, shows, and a large variety of other activities. R.L. Engebretson / Tvenge Associates contracted with the City of Bismarck in 1987 to develop a long-range plan to assess the physical condition of the Civic Center, to help define existing and future building needs, and to design additions and renovations to meet those needs. A master plan was prepared in 1988 and updated in 1997. Since 1988 the projects listed above have been completed. Future improvements described in the master plan include more meeting rooms, ballroom, theater, hotel, parking ramp, skyboxes, and locker room improvements.
Bismarck Civic Center is a 300,000 square foot multi-use events center with a 10,000 seat arena, 50,000 square foot exhibit hall, and meeting rooms to serve conventions, sporting events, concerts, shows, and a large variety of other activities. R.L. Engebretson / Tvenge Associates contracted with the City of Bismarck in 1987 to develop a long-range plan to assess the physical condition of the Civic Center, to help define existing and future building needs, and to design additions and renovations to meet those needs. A master plan was prepared in 1988 and updated in 1997. Since 1988 the projects listed above have been completed. Future improvements described in the master plan include more meeting rooms, ballroom, theater, hotel, parking ramp, skyboxes, and locker room improvements.
Sedona Cultural Park, Sedona, AZ
Sedona Cultural Park Amphitheatre is located in Sedona Arizona and has a seating capacity of 5,000 for concerts and musicals. The work performed was public restrooms and backstage screening. The facility was designed to blend in with the rest of the natural background and existing design.
Sedona Cultural Park Amphitheatre is located in Sedona Arizona and has a seating capacity of 5,000 for concerts and musicals. The work performed was public restrooms and backstage screening. The facility was designed to blend in with the rest of the natural background and existing design.
FARGODOME, Fargo, ND
The FARGODOME and City of Fargo have called upon R.L. Engebretson’s design team time and time again because of their long-standing relationship and trust that RLE does the job efficiently and with the highest quality. Some major projects that RLE has performed at the FARGODOME include the following. FARGODOME Flood Reconstruction after eight feet of floodwaters permeated all major building systems. Daily meetings were held to discuss progress, coordinate trades and identify problems. In short, three weeks later the Dixie Chicks took the stage after an amazing effort by the selected contractors, the FARGODOME staff and our firm. The FARGODOME Suites project included demolition of existing stadia in eight sections of the arena, erection of precast concrete stairs, walls and planks, poured concrete ramps and platform, and installation of glazing and seats. Interior finishes, casework and furniture package options were also completed for the suites. The FARGODOME also called upon R.L. Engebretson to design a fall protection system that would allow one hundred percent tie-off on 23 175-foot joists spanning 117 feet above the arena floor. The fall protection system serves the north and center stage sections of the FARGODOME. The project also included one hundred percent tie-off fall protection above nine 16-foot-long joists at the theatre set area of the arena.
The FARGODOME and City of Fargo have called upon R.L. Engebretson’s design team time and time again because of their long-standing relationship and trust that RLE does the job efficiently and with the highest quality. Some major projects that RLE has performed at the FARGODOME include the following. FARGODOME Flood Reconstruction after eight feet of floodwaters permeated all major building systems. Daily meetings were held to discuss progress, coordinate trades and identify problems. In short, three weeks later the Dixie Chicks took the stage after an amazing effort by the selected contractors, the FARGODOME staff and our firm. The FARGODOME Suites project included demolition of existing stadia in eight sections of the arena, erection of precast concrete stairs, walls and planks, poured concrete ramps and platform, and installation of glazing and seats. Interior finishes, casework and furniture package options were also completed for the suites. The FARGODOME also called upon R.L. Engebretson to design a fall protection system that would allow one hundred percent tie-off on 23 175-foot joists spanning 117 feet above the arena floor. The fall protection system serves the north and center stage sections of the FARGODOME. The project also included one hundred percent tie-off fall protection above nine 16-foot-long joists at the theatre set area of the arena.